*Fair usage rules apply. *Standard connection fee applies to properties inside the original network plan that can be connected in a three hour window with a clear route to the property either by overhead cable or existing underground conduit.
If additional installation or clearance works outside the scope of a standard connection are necessary, a free site survey will be offered, and any additional charges communicated.
Additional works include, but are not limited to: – Installing or unblocking conduit connection route (to bring connection from the road to the property) – Tree trimming or avoidance (where trees or overgrowth prevent connection to the property)
For property outside the original network plan, a network extension is considered based on the volume of interest and a standard contribution of £499 payable by new customers in the extended area. No fees will be liable without consultation.
We use cookies to ensure that we give you the best experience on our website. If you continue to use this site we will assume that you are happy with it.